- Institution
- 강원특별자치도 원주시
- Department
- 건설과
○단계동 종합청사사거리 지하차도 설치
Programme 지방채 상환(건설과)
Amounts and period
- Budgeted amount
- 9,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 29,871,709,000 KRW0.0%
-
Policy 재무활동(건설과) 3,496,000,000 KRW0.3%
-
Programme 보전지출(건설과) 3,496,000,000 KRW0.3%
-
Project 지방채 상환(건설과) 3,496,000,000 KRW0.3%
-
Budget category 차입금이자상환 96,000,000 KRW9.4%
-
Statistical item 시ㆍ군ㆍ구지역개발기금차입금이자상환 63,000,000 KRW14.3%
-
Item ○단계동 종합청사사거리 지하차도 설치 9,000,000 KRW
- Category–statistical code
- 311-01
- Group
- Not provided in source
Original description
9,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
10 items- ○단계동 종합청사사거리 지하차도 설치 9,000,000 KRW Opens in a new window
- ○서부순환도로(무실~만종간) 개설 15,000,000 KRW Opens in a new window
- ○도시계획도로1-13호(태장~행구간) 도로개설(2010년) 21,000,000 KRW Opens in a new window
- ○도시계획도로1-13호(태장~행구간) 도로개설(2011년) 18,000,000 KRW Opens in a new window
- ○단계동 종합청사사거리 지하차도 설치 33,000,000 KRW Opens in a new window
- ○서부순환도로(무실~만종간) 개설 1,000,000,000 KRW Opens in a new window
- ○단계동 종합청사사거리 지하차도 설치 300,000,000 KRW Opens in a new window
- ○도시계획도로1-13호(태장~행구간) 도로개설(2010년) 700,000,000 KRW Opens in a new window
- ○도시계획도로1-13호(태장~행구간) 도로개설(2011년) 400,000,000 KRW Opens in a new window
- ○단계동 종합청사사거리 지하차도 설치 1,000,000,000 KRW Opens in a new window
Data source
View source document details
- Document ID
doc_0xq5ng5r5vefs22znsv7kc0127- Source document status
- Available
- File type
- application/pdf
- File size
- 109.52 KiB
- Location inside the source
- Page 4 Row 19 Line 4 Column level4
Source and reference
FY 2024 release No source record
- Fiscal year of record
- 2024
- Fetched from the source
- 2026-07-29 18:44
- Read and interpreted
- 2026-07-29 18:44
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_7x1k8akwm45hdneq36dredzve4- Address of this item
- /en/BudgetDetail/Item/bi_7x1k8akwm45hdneq36dredzve4
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “종합청사사거리” · classification 311-01
- ○단계동 종합청사사거리 지하차도 설치 4,500,000 KRW
- ○단계동 종합청사사거리 지하차도 설치 13,500,000 KRW
- ○단계동 종합청사사거리 지하차도 설치 18,000,000 KRW
- ○단계동 종합청사사거리 지하차도 설치 38,651,000 KRW
- ○단계동 종합청사사거리 지하차도 설치 84,000,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.