- Institution
- 인천광역시 강화군
- Department
- 서도면
○주문2리(1117-4번지 일원) 방조제 콘크리트포장공사(L=560m,B=3m)
Programme 서도면 마을안길 정비
Amounts and period
- Budgeted amount
- 210,000,000 KRW
- 기정액
- 0 KRW
- Change
- +210,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 서도면 2,624,456,000 KRW8.0%
-
Policy 서도면 사업경비 2,247,831,000 KRW9.3%
-
Programme 지역사회개발 1,255,000,000 KRW16.7%
-
Project 서도면 마을안길 정비 730,000,000 KRW28.8%
-
Budget category 시설비및부대비 730,000,000 KRW28.8%
-
Statistical item 시설비 730,000,000 KRW28.8%
-
Item ○주문2리(1117-4번지 일원) 방조제 콘크리트포장공사(L=560m,B=3m) 210,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○주문2리(1117-4번지 일원) 방조제 콘크리트 포장공사(L=560m,B=3m) 210,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
3 itemsData source
- Document ID
doc_59sr89jy23b8nj4eegkvy95h49- Source document status
- Available
- File type
- application/pdf
- File size
- 1,229.67 KiB
- Location inside the source
- Page 123 Row 10 Line 6 Column level4
Source and reference
FY 2026 release No source record
- Fiscal year of record
- 2026
- Fetched from the source
- 2026-07-29 19:10
- Read and interpreted
- 2026-07-29 19:10
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_7xsbfmxahs4knfbjqc9h8jhhw1- Address of this item
- /en/BudgetDetail/Item/bi_7xsbfmxahs4knfbjqc9h8jhhw1
Related records
Similar budgets
5 itemsKeyword “콘크리트포장공사” · classification 401-01
- ○주문2리(1117-4번지 일원) 방조제 콘크리트포장공사(L=560m,B=3m) 210,000,000 KRW
- ○장흥2리(164-21번지 일원) 마을안길 콘크리트포장공사(L=100m,B=3m) 50,000,000 KRW
- ○온수3리(92-5번지 일원) 마을안길 콘크리트포장공사(L=50m,B=3.0m) 10,000,000 KRW
- ○ 보성1리 콘크리트포장공사(L=100m, B=3m) 20,000,000 KRW
- ○철거후 콘크리트포장공사(B=3.0m)L=200.0m 70,000,000 KRW
These items were verified within a limited set of name search results.