- Institution
- 충청남도 천안시
- Department
- 건설도로과
○ 집행잔액 0원
Programme 동서연결도로개설
Amounts and period
- Budgeted amount
- 0 KRW
- 기정액
- 200,000,000 KRW
- Change
- −200,000,000 KRW −100.0%
A zero here is what the source recorded. Missing values are never folded into zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설도로과 67,485,400,000 KRW0.0%
-
Policy 도로망확충관리(건설도로과) 50,932,659,000 KRW0.0%
-
Programme 도시계획도로개설(도로시설팀) 38,154,533,000 KRW0.0%
-
Project 동서연결도로개설 38,680,000 KRW0.0%
-
Budget category 자치단체등자본이전 0 KRW
-
Item ○ 집행잔액 0원 0 KRW
- Category–statistical code
- 403
- Group
- Not provided in source
Original description
Not provided in source
Institution and programme names are shown as the original Korean source text.
Detailed budget items
1 itemsData source
View source document details
- Document ID
doc_35sexvr9eqydfv28namvaxbg5m- Source document status
- Available
- File type
- application/pdf
- File size
- 3,403.712 KiB
- Location inside the source
- Page 125 Row 2 Line 1 Column level4
Source and reference
FY 2016 release No source record
- Fiscal year of record
- 2016
- Fetched from the source
- 2026-07-29 17:44
- Read and interpreted
- 2026-07-29 17:44
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_7zaqd34zk0bdp68vrq1d392dbk- Address of this item
- /en/BudgetDetail/Item/bi_7zaqd34zk0bdp68vrq1d392dbk
Related records
Similar budgets
Items share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
The name or classification needed to find similar budgets is unavailable.
AI analysis report
AI analysis reports are not yet available.