- Institution
- 경기도 광주시
- Department
- 교통시설과
○곤지암역세권 공영주차장 유료화 추진공사
Programme 공영주차장 조성 및 유지관리
Amounts and period
- Budgeted amount
- 240,000,000 KRW
- 기정액
- 0 KRW
- Change
- +240,000,000 KRW
A zero here is what the source recorded. Missing values are never folded into zero.
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 교통시설과 8,007,475,000 KRW3.0%
-
Policy 시민중심의 주차시설 조성 4,273,678,000 KRW5.6%
-
Programme 주차장 확충 및 시설물 관리(교통사업특별회계) 3,455,772,000 KRW6.9%
-
Project 공영주차장 조성 및 유지관리 2,980,772,000 KRW8.1%
-
Budget category 시설비및부대비 258,000,000 KRW93.0%
-
Statistical item 시설비 258,000,000 KRW93.0%
-
Item ○곤지암역세권 공영주차장 유료화 추진공사 240,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
240,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
4 itemsData source
-
Open source PDF
경기도 광주시 · FY2025 1회 추경 · 통합회계 · 2025년 제1회 일반 및 기타 특별회계 세입세출 추가경정 예산서
Opens in a new window
- Page
- 518 / 539
- Document ID
doc_3rh97rqte428r2nxvdkt8n6y99- Source document status
- Available
- File type
- application/pdf
- File size
- 8,034.436 KiB
- Location inside the source
- Page 518 Row 9 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 20:30
- Read and interpreted
- 2026-07-29 20:30
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_0jv1yv17c8z0mp285d4wweqecw- Address of this item
- /en/BudgetDetail/Item/bi_0jv1yv17c8z0mp285d4wweqecw
Related records
Similar budgets
5 itemsKeyword “곤지암역세권” · classification 401-01
- ○곤지암역세권 공영주차장 유료화 추진공사경정 200,000,000 KRW −16.7%
- ○곤지암역세권(2단계) 도시개발사업경정 1,650,000,000 KRW +65.0%
- ○곤지암역세권 광장 야외무대 설치공사경정 500,000,000 KRW +2,172.7%
- ○곤지암역세권(2단계) 도시개발사업 1,000,000,000 KRW
- ○곤지암역세권 도시개발사업 지구외 하천정비사업 경정 5,460,000,000 KRW +2,000.0%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.