- Institution
- 경기도 광주시
- Department
- 교통시설과
○곤지암역세권 공영주차장 유료화 추진공사경정
Programme 공영주차장 조성 및 유지관리
Amounts and period
- Budgeted amount
- 200,000,000 KRW
- 기정액
- 240,000,000 KRW
- Change
- −40,000,000 KRW −16.7%
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 교통시설과 8,235,088,000 KRW2.4%
-
Policy 시민중심의 주차시설 조성 4,176,394,000 KRW4.8%
-
Programme 주차장 확충 및 시설물 관리(교통사업특별회계) 3,318,488,000 KRW6.0%
-
Project 공영주차장 조성 및 유지관리 2,887,488,000 KRW6.9%
-
Budget category 시설비및부대비 203,000,000 KRW98.5%
-
Statistical item 시설비 203,000,000 KRW98.5%
-
Item ○곤지암역세권 공영주차장 유료화 추진공사경정 200,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○곤지암역세권 공영주차장 유료화 추진공사 경정 200,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
4 itemsData source
-
Open source PDF
경기도 광주시 · FY2025 3회 추경 · 통합회계 · 2025년 제3회 일반 및 기타 특별회계 세입세출 추가경정 예산서
Opens in a new window
- Page
- 499 / 525
View source document details
- Document ID
doc_2rm0a3nsp8avm0t5d42ytqrpdt- Source document status
- Available
- File type
- application/pdf
- File size
- 3,283.595 KiB
- Location inside the source
- Page 499 Row 11 Line 2 Column level4
Source and reference
FY 2025 release No source record
- Fiscal year of record
- 2025
- Fetched from the source
- 2026-07-29 20:30
- Read and interpreted
- 2026-07-29 20:30
- Query snapshot refreshed
- 2026-09-02 03:23
- Item ID
bi_36bdawx4yt6ppm27e9y3jjv1xk- Address of this item
- /en/BudgetDetail/Item/bi_36bdawx4yt6ppm27e9y3jjv1xk
Related records
Similar budgets
5 itemsItems share the same budget classification and a related name. Different years may be included. The name search uses the keyword without a classification filter.
Keyword “곤지암역세권” · classification 401-01
- ○곤지암역세권 공영주차장 유료화 추진공사 240,000,000 KRW
- ○곤지암역세권(2단계) 도시개발사업경정 1,650,000,000 KRW +65.0%
- ○곤지암역세권 광장 야외무대 설치공사경정 500,000,000 KRW +2,172.7%
- ○곤지암역세권(2단계) 도시개발사업 1,000,000,000 KRW
- ○곤지암역세권 도시개발사업 지구외 하천정비사업 경정 5,460,000,000 KRW +2,000.0%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.