- Institution
- 강원특별자치도 원주시
- Department
- 건설과
○단계동 종합청사사거리 지하차도 설치( L=0.47km, B=17.4m) 경정
Programme 단계동 종합청사사거리 지하차도 설치
Amounts and period
- Budget amount
- 2,962,000,000 KRW
- 기정액
- 2,712,000,000 KRW
- Change
- +250,000,000 KRW +9.2%
Original and supplementary budgets by year
These are confirmed amounts for each stage; do not add them together. Year-on-year changes compare the latest confirmed stage in each year. No change is calculated when the preceding year is missing or an amount or link is uncertain.
| Year | Original budget | Supplementary 1 | Supplementary 2 | Supplementary 3 | Year-on-year change |
|---|---|---|---|---|---|
| FY2011 | Amount unconfirmed | 2,962,000,000 KRW Selected | 1,875,000,000 KRW | 1,775,000,000 KRW | Not comparable |
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 44,971,180,000 KRW6.6%
-
Policy 도로교통망 확충 21,234,268,000 KRW13.9%
-
Programme 시도 정비 13,457,300,000 KRW22.0%
-
Project 단계동 종합청사사거리 지하차도 설치 2,965,255,000 KRW99.9%
-
Budget category 시설비및부대비 2,965,255,000 KRW99.9%
-
Statistical item 시설비 2,962,000,000 KRW100.0%
-
Item ○단계동 종합청사사거리 지하차도 설치( L=0.47km, B=17.4m) 경정 2,962,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○단계동 종합청사사거리 지하차도 설치( L=0.4 7km, B=17.4m) 경정 2,962,000,000원
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
- Document ID
doc_1bqn7gpfgv04p12wkgajrhn0e8- Source document status
- Available
- File type
- application/pdf
- File size
- 90.329 KiB
- Location inside the source
- Page 1 Row 27 Line 1 Column level4
Source and reference
FY 2011 release No source record
- Fiscal year of record
- 2011
- Fetched from the source
- 2026-07-29 17:10
- Read and interpreted
- 2026-07-29 17:10
- Query snapshot refreshed
- 2026-11-16 11:44
- Item ID
bi_1jy3h1wf8kprckfgcvq04h58hh- Address of this item
- /en/BudgetDetail/Item/bi_1jy3h1wf8kprckfgcvq04h58hh
Related records
Similar budgets
5 itemsKeyword “종합청사사거리” · classification 401-01
- ○단계동 종합청사사거리 지하차도 설치( L=0.47km, B=17.4m) 경정 1,775,000,000 KRW −5.3%
- ○단계동 종합청사사거리 지하차도 설치( L=0.47km, B=17.4m) 2,712,000,000 KRW
- ○단계동 종합청사사거리 지하차도 설치( L=0.47km, B=17.4m) ▷시설비 3,922,691,000 KRW
- ○단계동 종합청사사거리 지하차도 설치( L =0.52km, B=20m) ▷시설비 12,820,513,000 KRW
- ○단계동 종합청사사거리 지하차도 설치( L=0.4 4,014,111,000 KRW +2.3%
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.