- Institution
- 강원특별자치도 원주시
- Department
- 건설과
○단계동 종합청사사거리 지하차도 설치( L=0.47km, B=17.4m)
Programme 단계동 종합청사사거리 지하차도 설치
Amounts and period
- Budget amount
- 2,712,000,000 KRW
- 전년도예산액
- Present in the source but not extracted
- Change
- Not comparable
Changes are calculated only when both amounts are known in full. No percentage is calculated when the comparison amount is zero.
Programme hierarchy and share
The selected item’s share of each parent budget, calculated from amounts in the same source document.
A share is not calculated for missing or partial amounts, non-positive parent amounts, or an item amount greater than its parent.
-
Department 건설과 41,783,792,000 KRW6.5%
-
Policy 도로교통망 확충 19,481,986,000 KRW13.9%
-
Programme 시도 정비 12,710,928,000 KRW21.3%
-
Project 단계동 종합청사사거리 지하차도 설치 2,721,764,000 KRW99.6%
-
Budget category 시설비및부대비 2,721,764,000 KRW99.6%
-
Statistical item 시설비 2,712,000,000 KRW100.0%
-
Item ○단계동 종합청사사거리 지하차도 설치( L=0.47km, B=17.4m) 2,712,000,000 KRW
- Category–statistical code
- 401-01
- Group
- Not provided in source
Original description
○단계동 종합청사사거리 지하차도 설치( L=0.4 7km, B=17.4m) 2,712,000,000원*1식
Institution and programme names are shown as the original Korean source text.
Detailed budget items
2 itemsData source
-
Open source PDF
강원특별자치도 원주시 · FY2011 본예산 · 통합회계 · 2011 본예산 회계별 세입, 세출예산 사업명세서 건설도시국
Opens in a new window
- Page
- 2 / 15
- Document ID
doc_5sjrxh52c97ayw617vhx0tc8x0- Source document status
- Available
- File type
- application/pdf
- File size
- 136.134 KiB
- Location inside the source
- Page 2 Row 2 Line 1 Column level4
Source and reference
FY 2011 release No source record
- Fiscal year of record
- 2011
- Fetched from the source
- 2026-07-29 17:11
- Read and interpreted
- 2026-07-29 17:11
- Query snapshot refreshed
- 2026-11-14 09:03
- Item ID
bi_4g6mbr22c79m6dvewt6gn2wtq6- Address of this item
- /en/BudgetDetail/Item/bi_4g6mbr22c79m6dvewt6gn2wtq6
Related records
Similar budgets
5 itemsKeyword “종합청사사거리” · classification 401-01
- ○단계동 종합청사사거리 지하차도 설치( L=0.47km, B=17.4m) 경정 1,875,000,000 KRW −36.7%
- ○단계동 종합청사사거리 지하차도 설치( L=0.47km, B=17.4m) 경정 2,962,000,000 KRW +9.2%
- ○단계동 종합청사사거리 지하차도 설치( L=0.47km, B=17.4m) 경정 1,775,000,000 KRW −5.3%
- ○단계동 종합청사사거리 지하차도 설치( L=0.47km, B=17.4m) ▷시설비 3,922,691,000 KRW
- ○단계동 종합청사사거리 지하차도 설치( L =0.52km, B=20m) ▷시설비 12,820,513,000 KRW
These items were verified within a limited set of name search results.
AI analysis report
AI analysis reports are not yet available.